Saudi-Egypt grid interconnection project
One of 4 projects Taiyo tracks in Egypt, Saudi Arabia.
Source: InfraPPPWorld
The project involves the development of a high voltage overhead transmission line (OHTL) in Saudi Arabia to connect the electricity grids of the kingdom and Egypt. With a total length of 900 km, the 500kV OHTL goes through Medina and Tabuk on route to the Gulf of Aqaba.The interconnection is expected to transport up to 3,000MW of electricity a day.
- Status
- Prospective
- Sector
- Power Transmission, Oil and Gas, Power Generation (CCGT), Road, Government
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Saudi-Egypt grid interconnection project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | project signed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a high voltage overhead transmission line (OHTL) in Saudi Arabia to connect the electricity grids of the kingdom and Egypt. With a total length of 900 km, the 500kV OHTL goes through Medina and Tabuk on route to the Gulf of Aqaba.The interconnection is expected to transport up to 3,000MW of electricity a day. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Oil and Gas, Power Generation (CCGT), Road, Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
