Sauk Centre City of Hangar
Sector: Water Supply and Storage • Location: Sauk Centre Township, Minnesota, United States of America
Source: Dodge
REMOVE GARAGE SLAB 1 LS; INSTALL 15" FLARED END SECTION 2 EA;REMOVE ELECTRICAL WIRING 1 LS; INSTALL 15" CMP CULVERT 40 LIN FT; SEAL EXISTING WATER WELL 1 LS; INSTALL WATER WELL 1 LS; REMOVE FLARED END SECTION 2 EA 3" CONCRETE VALLEY GUTTER 135 LIN FT; REMOVE 15" CMP CULVERT 50 LIN FT; L-867 HANDHOLE 4 EA; REMOVE BITUMINOUS PAVEMENT 200 SQ YD; NO. 8 WG, 5kV CABLE, INSTALLED IN DUCT BANK OR CONDUIT
- Status
- Closed
- Sector
- Water Supply and Storage, Telecommunications, Government, Car parking, Road, Cement, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive
- Location
- Sauk Centre Township, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sauk Centre City of Hangar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | REMOVE GARAGE SLAB 1 LS; INSTALL 15" FLARED END SECTION 2 EA;REMOVE ELECTRICAL WIRING 1 LS; INSTALL 15" CMP CULVERT 40 LIN FT; SEAL EXISTING WATER WELL 1 LS; INSTALL WATER WELL 1 LS; REMOVE FLARED END SECTION 2 EA 3" CONCRETE VALLEY GUTTER 135 LIN FT; REMOVE 15" CMP CULVERT 50 LIN FT; L-867 HANDHOLE 4 EA; REMOVE BITUMINOUS PAVEMENT 200 SQ YD; NO. 8 WG, 5kV CABLE, INSTALLED IN DUCT BANK OR CONDUIT 870 LIN FT; COMMON EXCAVATION, P 450 CU YD; NO. 6 AWG, 600V CABLE, INSTALLED IN DUCT BANK OR COND... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Sauk Centre Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Telecommunications, Government, Car parking, Road, Cement, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
