Savage Sewer Replacement - Phase 1
Sector: Water Supply and Storage • Location: Show Low, Arizona, United States of America
Source: Dodge USA
The work includes, but is not necessarily limited to, the removal of the existing sewer main, installation of approximately 2,500 LF of 18-inch SDR-35 sewer main, and 9 polymer manholes. The work includes all required labor, material, by-pass pumping, transportation and services. This work shall take place along sewer easements north of Old Linden Road between the Show Low High School and Whipple
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes, but is not necessarily limited to, the removal of the existing sewer main, installation of approximately 2,500 LF of 18-inch SDR-35 sewer main, and 9 polymer manholes. The work includes all required labor, material, by-pass pumping, transportation and services. This work shall take place along sewer easements north of Old Linden Road between the Show Low High School and Whipple Ranch Elementary School, Show Low, Arizona, 85901. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
