logo

Sawalkot HE Project

Sector: Cement • Location: Ramban, Jammu and Kashmir, India

Source: India Investment Grid (IIG)

Project
Dpr/Feasibility Study

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with Sawalkot HE Project with a ticket size of 22704.8 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Sawalkot HE Project is a RoR Scheme locat

Project Information FAQ

Project Information

5 Q
The project “Sawalkot HE Project” is an infrastructure initiative in the Cement sector, located in Ramban, Jammu and Kashmir, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dpr/feasibility study

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with Sawalkot HE Project with a ticket size of 22704.8 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Sawalkot HE Project is a RoR Scheme located on River Chenab, in Ramban, UT of Jammu & Kashmir. In pursuance of MoU signed between NHPC Limited and JKSPDC on 03.01.2021, Sawalkot HE Project has been allotted to NHPC Ltd for execution on BOOT basis for 40 years. Installed capacity of project is 1856 MW and 7994.73 MU design energy with 90 percent dependable year and 95 percent machine availability . The project envisages construction of 192.5 m High concrete gravity dam, 08 nos undeground circular steel lined pressure shaft / penstocks leading to an underground main power house cavern accommodating 08 units of 225 MW each and 01 no pressure shafts / penstock for dam toe PH having 01 unit of 56 MW.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data