logo
ProjectDpr/Feasibility Study

Sawalkot HE Project

Sector: Cement • Location: Ramban, Jammu and Kashmir, India

Source: India Investment Grid (IIG)

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with Sawalkot HE Project with a ticket size of 22704.8 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Sawalkot HE Project is a RoR Scheme locat

Status
Prospective
Sector
Cement, Hydro, Steel, Power Generation (CCGT), Road, Government, Water Supply and Storage, Metal
Location
Ramban, Jammu and Kashmir, India
Updated
19 Nov 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Sawalkot HE Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sawalkot HE Project” is an infrastructure initiative in the Cement sector, located in Ramban, Jammu and Kashmir, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

dpr/feasibility study

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with Sawalkot HE Project with a ticket size of 22704.8 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Sawalkot HE Project is a RoR Scheme located on River Chenab, in Ramban, UT of Jammu & Kashmir. In pursuance of MoU signed between NHPC Limited and JKSPDC on 03.01.2021, Sawalkot HE Project has been allotted to NHPC Ltd for execution on BOOT basis for 40 years. Installed capacity of project is 1856 MW and 7994.73 MU design energy with 90 percent dependable year and 95 percent machine availability . The project envisages construction of 192.5 m High concrete gravity dam, 08 nos undeground circular steel lined pressure shaft / penstocks leading to an underground main power house cavern accommodating 08 units of 225 MW each and 01 no pressure shafts / penstock for dam toe PH having 01 unit of 56 MW.

Original sector

Electricity Generation

Procurement method

Budget

Location

Country

India

State

Jammu and Kashmir

City

Ramban

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Cement, Hydro, Steel, Power Generation (CCGT), Road, Government, Water Supply and Storage, Metal

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project