Sawcut Bituminous and Concrete Based Roads IQC
Sector: Water Supply and Storage • Location: Providence, Rhode Island, United States of America
Source: Dodge
Saw cut various holes in the streets and sidewalks at depths ranging from four inches to fifteen inches required by Providence Water. 2. The contractor will be responsible for all saw cutting equipment and transportation, including water or other fluids needed for lubrication. 3. Providence Water will Premark all holes needing saw cutting. 4. Providence Water will notify Dig Safe prior to all saw
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Government, Cement, Commercial, Car parking, Automotive
- Location
- Providence, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sawcut Bituminous and Concrete Based Roads IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Saw cut various holes in the streets and sidewalks at depths ranging from four inches to fifteen inches required by Providence Water. 2. The contractor will be responsible for all saw cutting equipment and transportation, including water or other fluids needed for lubrication. 3. Providence Water will Premark all holes needing saw cutting. 4. Providence Water will notify Dig Safe prior to all saw cuts. 5. The contractor shall be responsible for all signs and safety equipment needed. 6. Provid... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Providence |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Government, Cement, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
