Sawmill Creek WWTP Expansion REBID
Sector: Chemical (Industrial) • Location: Huron, Ohio, United States of America
Source: Dodge USA
Scope - The Project includes the following Work: Expansion of the Sawmill Creek WWTP including Headworks Building with a mechanical screen and grit removal equipment, a 3 channel oxidation ditch, two 76 diameter clarifiers, sludge pumping building with 3 sludge pumps, a chemical feed building with storage tank and duplex pump skid, UV disinfections, post aeration, 2 final effluent pumps, standby p
- Status
- Under Construction
- Sector
- Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Commercial, Road, Government, Manufacturing (Industrial), Water Supply and Storage
- Location
- Huron, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sawmill Creek WWTP Expansion REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes the following Work: Expansion of the Sawmill Creek WWTP including Headworks Building with a mechanical screen and grit removal equipment, a 3 channel oxidation ditch, two 76 diameter clarifiers, sludge pumping building with 3 sludge pumps, a chemical feed building with storage tank and duplex pump skid, UV disinfections, post aeration, 2 final effluent pumps, standby power generator, leachate receiving facilities, electrical power and instrumentation, piping, and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Huron |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Commercial, Road, Government, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
