Sawmill Drive Culvert Replacement
Sector: Water Supply and Storage • Location: Dracut, Massachusetts, United States of America
Source: Dodge USA
Project includes the removal of the existing culverts, installation of the proposed 9.75 span X 4.83 rise 3-sided box culvert, any other associated work and all materials necessary to backfill, pave and complete work shown on the Contract Drawings.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
- Location
- Dracut, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sawmill Drive Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes the removal of the existing culverts, installation of the proposed 9.75 span X 4.83 rise 3-sided box culvert, any other associated work and all materials necessary to backfill, pave and complete work shown on the Contract Drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dracut |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
