logo
ProjectPre-Design

Saxman Intertie Improvements

Pre-design · Alaska · Last reported Nov 2024

Source: Dodge USA

This project will entail extending HDPE water mains from the end of the South Tongass Water Utility to intertie with the City of Saxman's water system as a standby water source. Work will include installation of a valve vault with metering and backflow prevention. This project is considered mutually beneficial, aiding the City of Saxman to replenish their treated water supply during low water situ

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
Saxman, Alaska, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Saxman Intertie Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Saxman Intertie Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Saxman, Alaska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This project will entail extending HDPE water mains from the end of the South Tongass Water Utility to intertie with the City of Saxman's water system as a standby water source. Work will include installation of a valve vault with metering and backflow prevention. This project is considered mutually beneficial, aiding the City of Saxman to replenish their treated water supply during low water situations and providing a standby water source if an issue occurs at Whitman Creek. The current stan...

Budget

Location

Country

United States of America (USA)

State

Alaska

City

Saxman

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project