Saydel HS Baseball Dugouts Improvements
Sector: Cement • Location: Des Moines, Iowa, United States of America
Source: Dodge
The work includes, but is not limited to: Removal of existing dugouts at Saydel High School baseball field. Both dugouts will be replaced with new recessed CMU dugouts with shed roofs and new concrete slabs. Each dugout will be equipped with new lighting, power, and a bottle filling station. One dugout will include an attached storage room equipped with an overhead door.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes, but is not limited to: Removal of existing dugouts at Saydel High School baseball field. Both dugouts will be replaced with new recessed CMU dugouts with shed roofs and new concrete slabs. Each dugout will be equipped with new lighting, power, and a bottle filling station. One dugout will include an attached storage room equipped with an overhead door. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
