logo
ProjectDisbursing

Sazagan-1 Solar PV and BESS

Sector: Water Supply and Storage • Location: Uzbekistan

Source: European Bank for Reconstruction and Development (EBRD)

Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501

Status
Under Construction
Sector
Water Supply and Storage, Energy Storage, Power Generation (CCGT), Geothermal, Warehouse, Solar, Commercial, Road, Power Transmission, Hydrogen, Residential
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sazagan-1 Solar PV and BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sazagan-1 Solar PV and BESS” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

disbursing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501MWh of BESS capacity, which helps the grid to mitigate the intermittency of renewables. The Project is expected to result in significant environmental benefits through introduction of 500MW of new renewable energy capacity corresponding to a reduction of CO2 emissions. • NTS (EN, UZ, RU) • ESIA main text (EN, UZ) • ESMP (EN, UZ) • BAP (EN, UZ) • LARLP (EN, UZ) • SEP (EN, UZ, RU) • ESAP (EN, UZ) Download zip package in English part I Download zip package in English part II Download zip package in English part III Download zip package in Uzbek part I Download zip package in Uzbek part II Download zip package in Uzbek part III Download zip package in Russian EBRD Resident Office in Tashkent 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, 100027, Tashkent, Uzbekistan Tel. +99 (8781) 404400 and Client website Farman Ahmed Khan Lodhi ACWA Power Uzbekistan Office, Business Center SIMURG 88a Amir Temur Avenue, Yunusabad District, 100084, Tashkent, Uzbekistan Tel. +99 (8900) 116155 e-mail: flodhi@acwapower.com

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Energy Storage, Power Generation (CCGT), Geothermal, Warehouse, Solar, Commercial, Road, Power Transmission, Hydrogen, Residential

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project