logo
ProjectExploratory

Sazagan-1 Solar PV and BESS

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501

Status
Prospective
Sector
Road, Solar, Water Supply and Storage, Geothermal, Warehouse, Hydrogen, Energy Storage, Residential, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sazagan-1 Solar PV and BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sazagan-1 Solar PV and BESS” is an infrastructure initiative in the Road sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

exploratory

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501MWh of BESS capacity, which helps the grid to mitigate the intermittency of renewables. The Project is expected to result in significant environmental benefits through introduction of 500MW of new renewable energy capacity corresponding to a reduction of CO2 emissions. Non-Technical Summary (NTS) – EN, RU and UZ Environmental and Social Impact Assessment including outline BAP (ESIA) – EN Critical Habitat Assessment (CHA) - EN Stakeholder Engagement Plan (SEP) – EN, RU and UZ Land Acquisition and Livelihood Restoration Plan (LALRP) – EN and UZ Environmental and Social Action Plan (ESAP) – EN Download zip package in English part I Download zip package in English part II Download zip package in English part III Download zip package in Uzbek Download zip package in Russian EBRD Resident Office in Tashkent 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, 100027, Tashkent, Uzbekistan Tel. +99 (8781) 404400 and Client website Farman Ahmed Khan Lodhi ACWA Power Uzbekistan Office, Business Center SIMURG 88a Amir Temur Avenue, Yunusabad District, 100084, Tashkent, Uzbekistan Tel. +99 (8900) 116155 e-mail: flodhi@acwapower.com

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Solar, Water Supply and Storage, Geothermal, Warehouse, Hydrogen, Energy Storage, Residential, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project