Sazagan-1 Solar PV and BESS
Sector: Road • Location: Uzbekistan
Source: European Bank for Reconstruction and Development (EBRD)
Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | exploratory |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Senior secured loan of up to USD 70 million to ACWA Power Sazagan Solar 1 LLC (the “Sazagan 1 SPV”). The Loan to the Sazagan 1 SPV will finance the development, design, construction and operation of a 500MW solar photovoltaic power plant and 501MWh battery energy storage systems (“BESS”) located in the Samarkand region in Uzbekistan. This is a landmark project for Uzbekistan as it introduces a 501MWh of BESS capacity, which helps the grid to mitigate the intermittency of renewables. The Project is expected to result in significant environmental benefits through introduction of 500MW of new renewable energy capacity corresponding to a reduction of CO2 emissions. Non-Technical Summary (NTS) – EN, RU and UZ Environmental and Social Impact Assessment including outline BAP (ESIA) – EN Critical Habitat Assessment (CHA) - EN Stakeholder Engagement Plan (SEP) – EN, RU and UZ Land Acquisition and Livelihood Restoration Plan (LALRP) – EN and UZ Environmental and Social Action Plan (ESAP) – EN Download zip package in English part I Download zip package in English part II Download zip package in English part III Download zip package in Uzbek Download zip package in Russian EBRD Resident Office in Tashkent 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, 100027, Tashkent, Uzbekistan Tel. +99 (8781) 404400 and Client website Farman Ahmed Khan Lodhi ACWA Power Uzbekistan Office, Business Center SIMURG 88a Amir Temur Avenue, Yunusabad District, 100084, Tashkent, Uzbekistan Tel. +99 (8900) 116155 e-mail: flodhi@acwapower.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
