Sazagan-2 Solar PV and BESS
Sector: Solar • Location: Uzbekistan
Source: European Bank for Reconstruction and Development (EBRD)
The Project is expected to result in significant environmental benefits through introduction of 500MW of new renewable energy capacity corresponding to a reduction of CO2 emissions. • NTS (EN, UZ, RU) • ESIA main text (EN, UZ) • ESMP (EN, UZ) • BAP (EN, UZ) • LARLP (EN, UZ) • SEP (EN, UZ, RU) • ESAP (EN, UZ) Download zip package in English part I Download zip package in English part II Download zi
- Status
- Under Construction
- Sector
- Solar, Road, Power Transmission, Geothermal, Water Supply and Storage, Residential, Commercial, Warehouse, Energy Storage, Hydrogen, Power Generation (CCGT), Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Sazagan-2 Solar PV and BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is expected to result in significant environmental benefits through introduction of 500MW of new renewable energy capacity corresponding to a reduction of CO2 emissions. • NTS (EN, UZ, RU) • ESIA main text (EN, UZ) • ESMP (EN, UZ) • BAP (EN, UZ) • LARLP (EN, UZ) • SEP (EN, UZ, RU) • ESAP (EN, UZ) Download zip package in English part I Download zip package in English part II Download zip package in English part III Download zip package in Uzbek part I Download zip package in Uzbek part II Download zip package in Uzbek part III Download zip package in Russian EBRD Resident Office in Tashkent 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, 100027, Tashkent, Uzbekistan Tel. +99 (8781) 404400 and Client website Farman Ahmed Khan Lodhi ACWA Power Uzbekistan Office, Business Center SIMURG 88a Amir Temur Avenue, Yunusabad District, 100084, Tashkent, Uzbekistan Tel. +99 (8900) 116155 e-mail: flodhi@acwapower.com |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Solar, Road, Power Transmission, Geothermal, Water Supply and Storage, Residential, Commercial, Warehouse, Energy Storage, Hydrogen, Power Generation (CCGT), Government |
Article published date | 2025-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
