SBC Limekiln Road Bridge Replacement
Sector: Bridge • Location: California, United States of America
Source: Dodge USA
The proposed project is the replacement of an existing bridge (Bridge No. 43C0054) over Pescadero Creek with a new, longer, and wider bridge which would accommodate two traffic lanes. The bridge is located in a rural area approximately 11 miles (mi) south of Hollister. The existing bridge is of 22 ft long and 14.1 ft wide. The proposed bridge will be a cast-in-place reinforced concrete slab bridge
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project is the replacement of an existing bridge (Bridge No. 43C0054) over Pescadero Creek with a new, longer, and wider bridge which would accommodate two traffic lanes. The bridge is located in a rural area approximately 11 miles (mi) south of Hollister. The existing bridge is of 22 ft long and 14.1 ft wide. The proposed bridge will be a cast-in-place reinforced concrete slab bridge approximately 41 ft in length, 35.5 ft in width, and clear spanning the creek with Caltrans Type... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
