logo
ProjectClosed

SCADA Improvements

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

The Project includes the following Work: 1. Electrical and SCADA modifications and additions to existing Well No. 2, Well No. 3, and Well No. 4 facilities. 2. Addition of a standby generator at Well No. 3. 3. Addition of a variable frequency drive for the existing well and booster pump and addition of a booster pump at Well No. 4. 4. Replacement of existing antenna mast at the Municipal Service Bu

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
Cottage Grove, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SCADA Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SCADA Improvements” is an infrastructure initiative in the Commercial sector, located in Cottage Grove, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: 1. Electrical and SCADA modifications and additions to existing Well No. 2, Well No. 3, and Well No. 4 facilities. 2. Addition of a standby generator at Well No. 3. 3. Addition of a variable frequency drive for the existing well and booster pump and addition of a booster pump at Well No. 4. 4. Replacement of existing antenna mast at the Municipal Service Building. 5. Replacement of existing pumps and motor control panel at Trillium Lift Station along w...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Cottage Grove

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project