Scatec Kalkbuilt Solar Plant

Sector: Commercial • Location: South Africa

Source: World Bank Group

Project
Active

Kalkbult Project Company (pty) Ltd was created to build, own and operate a 72.5 MW solar PV facility to be located in Kulbult, South Africa. The project company was a joint venture between the Norwegian firm Scatec Solar(60%) through its local subsidiary Scatec Solar SA, Standard Chartered South Africa (10%), Old Mutual Investment Group of South Africa (10%), and Simacel Kalkbult Holding (pty) L

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Solar, Power Transmission, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Scatec Kalkbuilt Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Scatec Kalkbuilt Solar Plant” is an infrastructure initiative in the Commercial sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Kalkbult Project Company (pty) Ltd was created to build, own and operate a 72.5 MW solar PV facility to be located in Kulbult, South Africa. The project company was a joint venture between the Norwegian firm Scatec Solar(60%) through its local subsidiary Scatec Solar SA, Standard Chartered South Africa (10%), Old Mutual Investment Group of South Africa (10%), and Simacel Kalkbult Holding (pty) LTD (20%). Norwegian firm Scatec Solar was 62.5% owned by Scatec (Norway), and 37.5% by Itochu (Japan). Simacel Kalkbult Holding (pty) LTD existed of the Kalkbult Local Community Trust and the Black Women Community Trust. The sponsor shares were assigned as follows: Scatec Solar holds 60% - Scatec holds 62.5% thereof (thus 37.5% of SPV); Itochu holds 37.5% thereof (thus 22.5% of SPV). The remaining sponsors all own less than 15%. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). There would be a 20 year PPA with the state owned utility, Eskom. The project developer was envisioning a second phase (+180MW) and a third phase (+175MW). Estimated project cost was EUR 200 million (USD 265 million), with expected commissioning in 2013. In November 2012 the project reached financial close. Total project cost was 259 million, of which 197 million was debt financed in local currency by Standard Bank. http://www.scatec-solar.com/x_x-news-press-releases-x_page_5_1.php?cmsshowfull=1_0_1001&dummy=0 http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Kalkbult%20(Scatec%20Solar%20SA%20166)%20(Pty)%20Ltd.pdf

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Solar, Power Transmission, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project