Scatec Kenhardt Hybrid Solar and Battery Farm
Sector: Raw Materials • Location: Northern Cape, South Africa
Source: Joburg ETC
A private sector project by Scatec consisting of a hybrid solar and battery farm in the Northern Cape, South Africa. The project includes a 225-megawatt battery system with more than 1,100 megawatt hours of storage, paired with 540-megawatt peak solar generation. It was tendered in September 2021, broke ground in July 2022, and was fully operational by December 2023.
- Status
- Closed
- Sector
- Raw Materials, Solar, Energy Storage
- Location
- Northern Cape, South Africa
- Updated
- 22 Jul 2026
- Source
- Joburg ETC
ConstructChat
Ask ConstructChat about Scatec Kenhardt Hybrid Solar and Battery Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A private sector project by Scatec consisting of a hybrid solar and battery farm in the Northern Cape, South Africa. The project includes a 225-megawatt battery system with more than 1,100 megawatt hours of storage, paired with 540-megawatt peak solar generation. It was tendered in September 2021, broke ground in July 2022, and was fully operational by December 2023. |
Original sector | Energy |
Location
Country | South Africa |
State | Northern Cape |
Source
Source | Joburg ETC |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Solar, Energy Storage |
Article published date | 2025-12-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
