logo
ProjectActive

SCCT Phase 3

Active · Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

 IFC is considering an investment of up to $175 million in the form of a corporate loan for a brownfield expansion of the Suez Canal Container Terminal S.A.E. (“SCCT” or “Company”). IFC proceeds will go to finance the design, construction, and operation of a 48 hectares expansion of the existing SCCT, which covers 120 hectares, for a total area after expansion of 168 hectares (“Project”). No envir

Status
Prospective
Sector
Water Supply and Storage, Consumer Products, Seaport, Warehouse, Road, Government
Location
Egypt
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about SCCT Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SCCT Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC is considering an investment of up to $175 million in the form of a corporate loan for a brownfield expansion of the Suez Canal Container Terminal S.A.E. (“SCCT” or “Company”). IFC proceeds will go to finance the design, construction, and operation of a 48 hectares expansion of the existing SCCT, which covers 120 hectares, for a total area after expansion of 168 hectares (“Project”). No environmental or social (“E&S”) sensitive receptors were identified in the vicinity of the project. The project construction is planned to start at the end of 2023. SCCT is located in Port Said’s Integrated Economic Zone (PSIEZ) established in 2004, which has a development plan including multipurpose terminals, grains terminals, and a logistics area.   SCCT will be responsible for tendering out and managing the superstructure works, which include ground reinforcement (e.g., subsurface works and pavement), yard construction, and provision of support facilities and equipment. The latter includes the supply of 12 electric Ship-to-Shore (“STS”) cranes, 30 electric Rubber Tired Gantry (“RTG”) cranes, a fleet of 90 trucks, 5 empty handlers, and 4 reach stackers.  SCCT is a joint venture of APM Terminals B.V. (“APMT”), a wholly owned subsidiary of Maersk, who is the majority shareholder (55%) and operator, with China Ocean Shipping Company (“COSCO”) with (20%), the Suez Canal Authority (10%), National Bank of Egypt (5%), and other Egyptian companies and individuals owning <5% (10%).

Original sector

E-BB - Port and Harbor Operations

Location

Country

Egypt

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Consumer Products, Seaport, Warehouse, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project