SCCT Phase 3
Active · Egypt, Arab Republic of
Source: IFC Project Disclosures
The project involves the expansion of the existing container terminal of Suez Canal Container Terminal S.A.E. (SCCT or the Company) at East Port Said Port (the Project). The exisitng terminal is currently operating with a berth length of 2,400m. The expansion aims to increase the terminal’s capacity by an additional capacity of 2.1 million Twenty-foot equivalent units (TEU) resulting in a total in
- Status
- Prospective
- Sector
- Seaport, Water Supply and Storage, Commercial
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about SCCT Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the expansion of the existing container terminal of Suez Canal Container Terminal S.A.E. (SCCT or the Company) at East Port Said Port (the Project). The exisitng terminal is currently operating with a berth length of 2,400m. The expansion aims to increase the terminal’s capacity by an additional capacity of 2.1 million Twenty-foot equivalent units (TEU) resulting in a total installed capacity of 6.6 million TEU. For the purpose of this expansion, the General Authority of Suez Canal Economic Zone (SCZone) granted the Company a concession agreement entailing the design, building, management and operation of a container terminal with an additional quay wall length of 955 meters and a yard adjacent to the current terminal. The Project costs are estimated at approximately US$489 million. The construction is expected to start at the end of 2023, with initial operations anticipated in the second half of 2025.                                                    |
Original sector | E-BB - Port and Harbor Operations |
Location
Country | Egypt |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Seaport, Water Supply and Storage, Commercial |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
