SCCT Phase 3

Sector: Warehouse • Location: Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

Project
Active

The project involves the expansion of the existing container terminal of Suez Canal Container Terminal S.A.E. (SCCT or the Company) at East Port Said Port (the Project). The exisitng terminal is currently operating with a berth length of 2,400m. The expansion aims to increase the terminal’s capacity by an additional capacity of 2.1 million Twenty-foot equivalent units (TEU) resulting in a total in

Project Information FAQ

Project Information

5 Q
The project “SCCT Phase 3” is an infrastructure initiative in the Warehouse sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the expansion of the existing container terminal of Suez Canal Container Terminal S.A.E. (SCCT or the Company) at East Port Said Port (the Project). The exisitng terminal is currently operating with a berth length of 2,400m. The expansion aims to increase the terminal’s capacity by an additional capacity of 2.1 million Twenty-foot equivalent units (TEU) resulting in a total installed capacity of 6.6 million TEU. For the purpose of this expansion, the General Authority of Suez Canal Economic Zone (SCZone) granted the Company a concession agreement entailing the design, building, management and operation of a container terminal with an additional quay wall length of 955 meters and a yard adjacent to the current terminal. The Project costs are estimated at approximately US$489 million. The construction is expected to start at the end of 2023, with initial operations anticipated in the second half of 2025.                                                   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data