logo
ProjectClosed

SC/DOT: I-77 Exit 26 New Interchange

Closed · South Carolina · Last reported Dec 2024

Source: Dodge USA

Contract No.: 4069410; Project. No.: P042443 & P030731; Design-Build Team for the design and construction of a new Exit 26 interchange along I-77 and Connecting Roads in Richland County. SCDOT proposes to construct a new interchange on I-77 near mile marker 26 in Richland County that will connect to US 21 via a new roadway to the east and Community Road to the west. The project will include a part

Status
Closed
Sector
Rail, Bridge, Manufacturing (Industrial), Road, Commercial
Location
Blythewood, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SC/DOT: I-77 Exit 26 New Interchange

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SC/DOT: I-77 Exit 26 New Interchange” is an infrastructure initiative in the Rail sector, located in Blythewood, South Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Contract No.: 4069410; Project. No.: P042443 & P030731; Design-Build Team for the design and construction of a new Exit 26 interchange along I-77 and Connecting Roads in Richland County. SCDOT proposes to construct a new interchange on I-77 near mile marker 26 in Richland County that will connect to US 21 via a new roadway to the east and Community Road to the west. The project will include a partial relocation of US 21 to include a bridge over the future Norfolk Southern railroad spur and a ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Blythewood

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Bridge, Manufacturing (Industrial), Road, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project