logo
ProjectClosed

SC/DOT: I-77 Exit 82 ABC/Cherry Rd US 21 Interchange

Closed · South Carolina · Last reported Aug 2025

Source: Dodge

I-77 interchange improvements at Exit 82 A, 82 B, 82 C at Cherry & Celenese Roads to convert into a double diverging diamond configuration

Status
Closed
Sector
Manufacturing (Industrial), Road, Commercial
Location
Rock Hill, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about SC/DOT: I-77 Exit 82 ABC/Cherry Rd US 21 Interchange

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SC/DOT: I-77 Exit 82 ABC/Cherry Rd US 21 Interchange” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rock Hill, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I-77 interchange improvements at Exit 82 A, 82 B, 82 C at Cherry & Celenese Roads to convert into a double diverging diamond configuration

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Rock Hill

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Road, Commercial

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project