SC/DOT: I-95 Widen MM 0 - MM 8/Bridge Replacement
Closed · South Carolina · Last reported Dec 2024
Source: Dodge USA
Project ID P040106: I-95 Widening MM 0-8 Project: I-95 Corridor Improvement from GA State Line to US 278 (16.000 Total Miles) Scope: I-95 Corridor Improvement from (MM0) GA State Line to Exit 8 US 278. Scope Widen I-95 from its existing 4-lane section to a 6-lane section beginning at the 6-lane section in Georgia at the Knoxboro Bridge at its southern terminus to approximately 1.0 mile north of US
- Status
- Closed
- Sector
- Bridge, Road, Commercial
- Location
- Ridgeland, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SC/DOT: I-95 Widen MM 0 - MM 8/Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project ID P040106: I-95 Widening MM 0-8 Project: I-95 Corridor Improvement from GA State Line to US 278 (16.000 Total Miles) Scope: I-95 Corridor Improvement from (MM0) GA State Line to Exit 8 US 278. Scope Widen I-95 from its existing 4-lane section to a 6-lane section beginning at the 6-lane section in Georgia at the Knoxboro Bridge at its southern terminus to approximately 1.0 mile north of US 278 (Exit 8) near Hardeeville at its northern terminus at MM 8. The project will include not onl... |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Ridgeland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
