logo
ProjectConstruction Documents

SC/DOT: US 17 Two Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Bridge Replacement - US 17 over Edisto River (2) Charleston US 17 0.250 0.81 miles E of Hope Plantation Lane (0.000) 0.50 miles W of Minow Drive (0.250) Colleton US 17 Bridge Replacement 0.360 0.54 miles E of Hope Plantation Lane (16.950) 0.74 miles W of Minow Drive (17.310)

Status
Closed
Sector
Road, Bridge, Commercial, Raw Materials
Location
South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about SC/DOT: US 17 Two Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SC/DOT: US 17 Two Bridge Replacement” is an infrastructure initiative in the Road sector, located in South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Replacement - US 17 over Edisto River (2) Charleston US 17 0.250 0.81 miles E of Hope Plantation Lane (0.000) 0.50 miles W of Minow Drive (0.250) Colleton US 17 Bridge Replacement 0.360 0.54 miles E of Hope Plantation Lane (16.950) 0.74 miles W of Minow Drive (17.310)

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Commercial, Raw Materials

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project