SC/DOT: US-278 Intersection Improvements (CO 130)
Sector: Cable car • Location: Ridgeland, South Carolina, United States of America
Source: Dodge
INTERSECTION IMPROVEMENT US 278 @ S442 . Approx. Length (miles): 0.3080. CO(S).: Jasper .MOBILIZATION 1.000 LS MOBILIZATION - SUBCONTRACTOR 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA UTILITY STAKING 1.000 LS CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS UNCLASSIFIED EXCAVATION 249.000 CY BORROW EXCAVATION 2,566.000 CY FINE GRADIN
- Status
- Closed
- Sector
- Cable car, Road, Telecommunications, Power Transmission, Power Generation (CCGT), Automotive, Commercial, Manufacturing (Industrial)
- Location
- Ridgeland, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SC/DOT: US-278 Intersection Improvements (CO 130)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | INTERSECTION IMPROVEMENT US 278 @ S442 . Approx. Length (miles): 0.3080. CO(S).: Jasper .MOBILIZATION 1.000 LS MOBILIZATION - SUBCONTRACTOR 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA UTILITY STAKING 1.000 LS CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS UNCLASSIFIED EXCAVATION 249.000 CY BORROW EXCAVATION 2,566.000 CY FINE GRADING 1,560.000 SY LIQUID ASPHALT BINDER PG64-22 60.100 TON MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Ridgeland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cable car, Road, Telecommunications, Power Transmission, Power Generation (CCGT), Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
