Scenic East Reservoir Rehabilitation Project
Sector: Metal • Location: Danville, California, United States of America
Source: East Bay Municipal Utility District
As part of EBMUD’s infrastructure renewal program, the Scenic East Reservoir located at the end of Maplewood Drive, Blackhawk will be upgraded. The existing 3.9 million gallon (MG) steel will get improvements to improve water quality and reduce maintenance costs. Workplan and schedule: The project calls to demolish the steel roof on the 3.9 MG reservoir; install additional course of steel to raise
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As part of EBMUD’s infrastructure renewal program, the Scenic East Reservoir located at the end of Maplewood Drive, Blackhawk will be upgraded. The existing 3.9 million gallon (MG) steel will get improvements to improve water quality and reduce maintenance costs. Workplan and schedule: The project calls to demolish the steel roof on the 3.9 MG reservoir; install additional course of steel to raise tank height; install wind girder, aluminum dome roof, access stairs, and fall protection; abrasive blast and re-coat the interior and exterior and dispose of hazardous materials. The project will also rehabilitate the valve vault; demolish vault cover and vault piping; install aluminum cover, mechanical piping, valves, appurtenances, buried pipe improvements, solar panel, fencing, radio antennae, and other electrical improvements; repave reservoir site. During the completion of the reservoir, residents can expect to hear and see hauling trucks and equipment required for grading. Allowable work hours for this project are: • Monday through Friday from 7:30 a.m. to 6 p.m. There are no anticipated water service interruptions associated with this project. The Scenic East Reservoir is part of a project that includes three additional reservoirs upgrade which includes, Acorn Reservoir, Derby Reservoir, and Scenic Reservoir. The active construction period for the Scenic East Reservoir project will be from March 2022 to the summer of 2023. Schedule is subject to change. Contact information: Emergencies or after-hours, call EBMUD at 866-403-2683 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
