logo

Scenic East Reservoir Rehabilitation Project

Sector: Metal • Location: Danville, California, United States of America

Source: East Bay Municipal Utility District

Project
Active

As part of EBMUD’s infrastructure renewal program, the Scenic East Reservoir located at the end of Maplewood Drive, Blackhawk will be upgraded. The existing 3.9 million gallon (MG) steel will get improvements to improve water quality and reduce maintenance costs. Workplan and schedule: The project calls to demolish the steel roof on the 3.9 MG reservoir; install additional course of steel to raise

Project Information FAQ

Project Information

4 Q
The project “Scenic East Reservoir Rehabilitation Project” is an infrastructure initiative in the Metal sector, located in Danville, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As part of EBMUD’s infrastructure renewal program, the Scenic East Reservoir located at the end of Maplewood Drive, Blackhawk will be upgraded. The existing 3.9 million gallon (MG) steel will get improvements to improve water quality and reduce maintenance costs. Workplan and schedule: The project calls to demolish the steel roof on the 3.9 MG reservoir; install additional course of steel to raise tank height; install wind girder, aluminum dome roof, access stairs, and fall protection; abrasive blast and re-coat the interior and exterior and dispose of hazardous materials. The project will also rehabilitate the valve vault; demolish vault cover and vault piping; install aluminum cover, mechanical piping, valves, appurtenances, buried pipe improvements, solar panel, fencing, radio antennae, and other electrical improvements; repave reservoir site. During the completion of the reservoir, residents can expect to hear and see hauling trucks and equipment required for grading. Allowable work hours for this project are: • Monday through Friday from 7:30 a.m. to 6 p.m. There are no anticipated water service interruptions associated with this project. The Scenic East Reservoir is part of a project that includes three additional reservoirs upgrade which includes, Acorn Reservoir, Derby Reservoir, and Scenic Reservoir. The active construction period for the Scenic East Reservoir project will be from March 2022 to the summer of 2023. Schedule is subject to change. Contact information: Emergencies or after-hours, call EBMUD at 866-403-2683

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data