Schedule 1 System Improvements
One of 10,000+ projects Taiyo tracks in South Dakota.
Source: Dodge USA
The Project consists of constructing approximately 139,150 feet of 3-inch, 6-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings and all appurtenances required by the Project Drawings, Specifications, and Contract Documents. The project is located in Hughes, Potter and Sully Counties in South Dakota.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Government, Waste Processing and Treatment
- Location
- Miller, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Schedule 1 System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of constructing approximately 139,150 feet of 3-inch, 6-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings and all appurtenances required by the Project Drawings, Specifications, and Contract Documents. The project is located in Hughes, Potter and Sully Counties in South Dakota. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Miller |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Government, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
