Schedule 2 System Improvements
Sector: Water Supply and Storage • Location: Miller, South Dakota, United States of America
Source: Dodge USA
The Project consists of constructing approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of constructing approximately 173,330 feet of 3-inch, 4-inch, 8-inch and 16-inch diameter gasketed joint polyvinyl chloride pipeline, connections to existing pipelines, cleanouts, road and stream crossings, appurtenances, replacement of one (1) existing prefabricated steel booster vault, rehabilitation of two (2) existing prefabricated steel booster vaults, and replacement of an existing tank weir and overflow pipe required by the Project Drawings, Specifications, and Con... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
