logo

SCHEDULING OF EVENT-TRIGGERED CONTROL TASKS

Sector: Broadband • Location: Netherlands

Source: EU Funding & Tenders Portal

Project
Ended

The advances in electronic communication and computation have enabled the ubiquity of Cyber-Physical Systems (CPS): digital systems that regulate and control all sorts of physical processes, such as chemical reactors, water distribution and power networks. These systems require the timely communication of sensor measurements and control actions to provide their prescribed functionalities. Event-tr

Project Information FAQ

Project Information

3 Q
The project “SCHEDULING OF EVENT-TRIGGERED CONTROL TASKS” is an infrastructure initiative in the Broadband sector, located in Netherlands. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The advances in electronic communication and computation have enabled the ubiquity of Cyber-Physical Systems (CPS): digital systems that regulate and control all sorts of physical processes, such as chemical reactors, water distribution and power networks. These systems require the timely communication of sensor measurements and control actions to provide their prescribed functionalities. Event-triggered control (ETC) techniques, which communicate only when needed to enforce performance, have attracted attention as a mean to reduce the communication traffic and save energy on (wireless) networked control systems (NCS). However, despite ETC’s great communication reductions, the scheduling of the aperiodic and largely unpredictable traffic that ETC generates remains widely unaddressed – hindering its true potential for energy and bandwidth savings. To address this problem, I will take up the following scientific challenges: (1) the construction of models for ETC’s communication traffic; (2) the design of schedulers based on such models guaranteeing prescribed performance levels. To reach these goals, I will employ scientific methods at the cross-roads between theoretical computer science, control systems and communications engineering. I propose to follow a two step approach that I have recently demonstrated: (i) modeling as timed-priced-game-automata (TPGA) the timing of communications of event-triggered control systems; and (ii) solving games over TPGAs to prevent data communication collisions and ensure prescribed performances for the control tasks. I will produce algorithms facilitating the efficient implementation of control loops over shared communication resources and increasing the energy efficiency of wireless NCS by orders of magnitude. The advances will be demonstrated on automotive and wireless water-distribution control applications, showcasing the potential economic impact from the reduction of implementation and maintenance costs on CPSs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data