logo
ProjectEnded

SCHEDULING OF EVENT-TRIGGERED CONTROL TASKS

Sector: Broadband • Location: Netherlands

Source: EU Funding & Tenders Portal

The advances in electronic communication and computation have enabled the ubiquity of Cyber-Physical Systems (CPS): digital systems that regulate and control all sorts of physical processes, such as chemical reactors, water distribution and power networks. These systems require the timely communication of sensor measurements and control actions to provide their prescribed functionalities. Event-tr

Status
Closed
Sector
Broadband, Power Generation (CCGT), Advanced Electronics, Chemical (Industrial), Manufacturing (Industrial), Road, Water Supply and Storage, Telecommunications, Automotive
Location
Netherlands
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about SCHEDULING OF EVENT-TRIGGERED CONTROL TASKS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SCHEDULING OF EVENT-TRIGGERED CONTROL TASKS” is an infrastructure initiative in the Broadband sector, located in Netherlands. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The advances in electronic communication and computation have enabled the ubiquity of Cyber-Physical Systems (CPS): digital systems that regulate and control all sorts of physical processes, such as chemical reactors, water distribution and power networks. These systems require the timely communication of sensor measurements and control actions to provide their prescribed functionalities. Event-triggered control (ETC) techniques, which communicate only when needed to enforce performance, have attracted attention as a mean to reduce the communication traffic and save energy on (wireless) networked control systems (NCS). However, despite ETC’s great communication reductions, the scheduling of the aperiodic and largely unpredictable traffic that ETC generates remains widely unaddressed – hindering its true potential for energy and bandwidth savings. To address this problem, I will take up the following scientific challenges: (1) the construction of models for ETC’s communication traffic; (2) the design of schedulers based on such models guaranteeing prescribed performance levels. To reach these goals, I will employ scientific methods at the cross-roads between theoretical computer science, control systems and communications engineering. I propose to follow a two step approach that I have recently demonstrated: (i) modeling as timed-priced-game-automata (TPGA) the timing of communications of event-triggered control systems; and (ii) solving games over TPGAs to prevent data communication collisions and ensure prescribed performances for the control tasks. I will produce algorithms facilitating the efficient implementation of control loops over shared communication resources and increasing the energy efficiency of wireless NCS by orders of magnitude. The advances will be demonstrated on automotive and wireless water-distribution control applications, showcasing the potential economic impact from the reduction of implementation and maintenance costs on CPSs.

Location

Country

Netherlands

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Broadband, Power Generation (CCGT), Advanced Electronics, Chemical (Industrial), Manufacturing (Industrial), Road, Water Supply and Storage, Telecommunications, Automotive

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project