Schilthornbahn 20XX Cable Car System
Sector: Wind • Location: Switzerland
Source: Unofficial Networks
The Schilthornbahn 20XX project aims to create a modern cable car system connecting Stechelberg to Mürren and further to Schilthorn, significantly reducing travel time and enhancing accessibility year-round. The project includes automated freight and luggage logistics and features high wind stability with Funifor cable cars.
- Status
- Under Construction
- Sector
- Wind, Automotive, Warehouse, Cable car, Commercial
- Location
- Switzerland
- Updated
- 22 Jul 2026
- Source
- Unofficial Networks
ConstructChat
Ask ConstructChat about Schilthornbahn 20XX Cable Car System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Schilthornbahn 20XX project aims to create a modern cable car system connecting Stechelberg to Mürren and further to Schilthorn, significantly reducing travel time and enhancing accessibility year-round. The project includes automated freight and luggage logistics and features high wind stability with Funifor cable cars. |
Original sector | Transportation |
Location
Country | Switzerland |
Source
Source | Unofficial Networks |
URL |
More Details
Record type | Project |
Sector | Wind, Automotive, Warehouse, Cable car, Commercial |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in Switzerland
- Nant de Drance Pumped Storage Power Station
- Birsfelden Hydroelectric Plant
- Alpine windharvest. Development of information base regarding potentials and the necessary technical, legal and socio-economic conditons for expanding wind energy in the Alpine space
- Villa M / Leopold Banchini Architects
- Scanner for Early-Stage Quality Control in Silicon Carbide Crystals
- An autonomous Real-Time Decision Tree framework for monitoring and diagnostics on wind turbines
- High Cycle Fatigue Cracking of Meso- and Micromechanical Testpieces of Aluminide Intermetallics, with in situ Nanoscale Strain Mapping
- Establishing stable IRON isotopes of laminated LAKE sediments as novel palaeoclimate proxy
