School 36 / José Adrião Arquitetos
Sector: Education • Location: Portugal
Source: ArchDaily
Text description provided by the architects.In 1972 Escola EB1 nº 36 was designed. Its construction began in 1974 and was interrupted in 1975 and resumed in 1982 and in 1984 it was inaugurated. The architect Fernando Gomes da Silva signed the architecture design although its author had been the architect Raul Ceregeiro.The school follows the teaching model developed by Maria Montessori (1870 – 195
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.In 1972 Escola EB1 nº 36 was designed. Its construction began in 1974 and was interrupted in 1975 and resumed in 1982 and in 1984 it was inaugurated. The architect Fernando Gomes da Silva signed the architecture design although its author had been the architect Raul Ceregeiro.The school follows the teaching model developed by Maria Montessori (1870 – 1952) – the Montessori Method is characterized by focusing on the child’s independence and liberty with limits and respect for the natural development of physical, social, and psychological skills. Its architecture was influenced by similar experiences performed in the United Kingdom and Sweden.The building is a succession of open and communicating spaces from the moment of the entrance to the classrooms. The classrooms have a direct relationship with the exterior reinforcing the open character of the building. Although some initial conditions of the proposal were changed, the architectural quality accomplished by the architecture project is still evident.To solve the main situations of malfunctioning of the school we propose the construction of 3 new program areas: Gym, Cafeteria/Kitchen, Exterior Covered Recreation Area. The construction of a new Gym and Cafeteria solves the existing acoustic problems. This strategy enabled us to interfere as less as possible in the existing school so as not to change its initial assumptions.In the communicating areas between the classrooms and the corridors, the walls do not reach the ceiling and therefore the school was permeable regarding ventilation and sound. The condition created by this opening in all spaces of the school – although it is quite spatially, rich and beneficial regarding natural ventilation – have since the beginning led to acoustic problems as well as the proper functioning of classes.Escola EB1 nº 36 is a building of patrimonial relevance because it is a constructive and formal expression of the teaching model created by Maria Montessori and mainly because the architectonic answer is coherent with the principles defined by the teaching model.Since 1972, the year that Escola was planned until nowadays many paradigms have changed in education and in the school building. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
