School Asphalt Replacement Phase 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
a. The asphalt is a replacement of the existing asphalt surface. Construction includes but is not necessarily limited to grinding or removal of existing asphalt concrete pavement, stockpile of existing aggregate base materials, asphalt surfacing materials, placement of aggregate base and asphalt concrete, seal coat of all asphalt surfaces, crack repair and pavementmarkings. b. Contractor shall pro
- Status
- Prospective
- Sector
- Road, Government, Education, Cement, Commercial
- Location
- Colton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about School Asphalt Replacement Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | a. The asphalt is a replacement of the existing asphalt surface. Construction includes but is not necessarily limited to grinding or removal of existing asphalt concrete pavement, stockpile of existing aggregate base materials, asphalt surfacing materials, placement of aggregate base and asphalt concrete, seal coat of all asphalt surfaces, crack repair and pavementmarkings. b. Contractor shall provide the removal of existing soil, regrading andreplacement of asphalt concrete paving. c. All na... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Colton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Government, Education, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
