School Building (Alteration)
Planning schematics · New York · Last reported Sep 2025
Source: Dodge
Filing with Hub per consult on 7/1/25 and Submitting incomplete for BSA review. Minor enlargement of an existing school on floors 1 and 2 for enhanced security at the entrance. BSA approval to be obtained minimum base height, max lot coverage, max FAR.
- Status
- Prospective
- Sector
- Commercial, Education
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about School Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Filing with Hub per consult on 7/1/25 and Submitting incomplete for BSA review. Minor enlargement of an existing school on floors 1 and 2 for enhanced security at the entrance. BSA approval to be obtained minimum base height, max lot coverage, max FAR. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Education |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
