School Crossing Improvements
Sector: Solar • Location: Rancho Cordova, California, United States of America
Source: Dodge
The work to be performed under this contract includes the furnishing of all labor, materials, equipment and incidentals for the School Crossing Improvements Project. Items of work include solar powered Rectangular Rapid Flashing Beacons (RRFBs), thermoplastic pavement markings, concrete curb, gutter and ramps. Sidewalk and sidewalk ramp improvements
- Status
- Closed
- Sector
- Solar, Mass Transit, Cement, Government, Commercial, Car parking, Power Generation (CCGT), Automotive, Rail, Road
- Location
- Rancho Cordova, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about School Crossing Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed under this contract includes the furnishing of all labor, materials, equipment and incidentals for the School Crossing Improvements Project. Items of work include solar powered Rectangular Rapid Flashing Beacons (RRFBs), thermoplastic pavement markings, concrete curb, gutter and ramps. Sidewalk and sidewalk ramp improvements |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Rancho Cordova |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Mass Transit, Cement, Government, Commercial, Car parking, Power Generation (CCGT), Automotive, Rail, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
