Schuster Parkway Trail Project
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Provide design support services for the Schuster parkway trail project. The services will include but are not limited to structural engineering, and geotechnical engineering services, environmental investigations, environmental mitigation and permitting, survey including topographical, utility and right-of-way, traffic signal upgrades, street light design, pedestrian scale lighting and urban desig
- Status
- Closed
- Sector
- Car parking, Road, Power Transmission, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT)
- Location
- Tacoma, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Schuster Parkway Trail Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide design support services for the Schuster parkway trail project. The services will include but are not limited to structural engineering, and geotechnical engineering services, environmental investigations, environmental mitigation and permitting, survey including topographical, utility and right-of-way, traffic signal upgrades, street light design, pedestrian scale lighting and urban design for placemaking and wayfinding, landscape architecture, right-of-way services, public involveme... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Tacoma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Power Transmission, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
