logo

SCI Greene CUP Upgrade Phase 1

Sector: Road • Location: Waynesburg, Pennsylvania, United States of America

Source: Dodge USA

Project
Gc Bidding

The project consists of the replacement of two existing boilers, three existing primary boiler pumps, three existing hot water secondary system pumps, three existing condensing water pumps and two existing chilled water system pumps with new boilers and pumps and all associated piping, valves, VFDs, power and controls. Also, the cooling tower shall be elevated to accommodate new condensing water p

Status
Under Construction
Sector
Road, Power Generation (CCGT), Water Supply and Storage, Commercial, Manufacturing (Industrial)
Location
Waynesburg, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SCI Greene CUP Upgrade Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SCI Greene CUP Upgrade Phase 1” is an infrastructure initiative in the Road sector, located in Waynesburg, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the replacement of two existing boilers, three existing primary boiler pumps, three existing hot water secondary system pumps, three existing condensing water pumps and two existing chilled water system pumps with new boilers and pumps and all associated piping, valves, VFDs, power and controls. Also, the cooling tower shall be elevated to accommodate new condensing water pump and piping configuration. The condensing water piping located under the road shall be abandon...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Waynesburg

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Water Supply and Storage, Commercial, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project