Science Building
Sector: Commercial • Location: San Francisco, California, United States of America
Source: San Francisco State University
The Science Building marks a turning point in the transformation of the campus. As the first new STEM building to be constructed at SF State in over 50 years, it will provide vital new teaching labs and classrooms for the Colleges and the University. Science faculty, staff, and students will no longer have to overcome the limitations of working in antiquated labs; the new spaces set the stage for
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Science Building marks a turning point in the transformation of the campus. As the first new STEM building to be constructed at SF State in over 50 years, it will provide vital new teaching labs and classrooms for the Colleges and the University. Science faculty, staff, and students will no longer have to overcome the limitations of working in antiquated labs; the new spaces set the stage for a bright and innovative future. The Science Replacement Building and associated renovation and seismic upgrade to the existing Science Building will have a transformative effect on how these facilities support innovative teaching and learning within the College of Science and Engineering (CoSE). The building will also provide interdisciplinary lecture and active learning classrooms for students throughout the campus, including much needed informal social space where all students, regardless of major, can gather and exchange ideas outside the classroom., Current phase: 100% schematic design, Program diagram, South elevation, East elevation, The new building will include a Student Success Center and an Office of Student Enrichment. The services provided by these programs are available to all CoSE students, and they are an essential part of the College’s retention efforts. These centers also provide discipline-specific guidance to help students plan for their careers after graduation. The new building will also include a permanent home for the College of Extended Learning (CEL)—funded from non-State sources. Relocating CEL from rental space located off-campus comes with two important advantages: first, CEL students will benefit from the synergies created by being close to other campus resources and academic departments, and second, their dollars will be invested in a permanent SF State home instead of used for renting retail space. The new building shares a site with the existing Science Building that opened in 1950. This project will also renovate and seismically stabilize this 55,000 square foot building. By combining new construction with thoughtful investments in the existing building, the University can maximize the value added by this project to our campus facilities., Estimated project timeline, Preliminary plans completed February 2021 Demolition Summer 2021 Design completed August 2021 Construction of new science building January 2022 - January 2024 Renovation of existing science building February 2024 - August 2024 Occupancy January 2024, Sustainability Features The Science Building is designed to achieve Leadership in Energy and Environmental Design (LEED) Gold certification. Sustainable characteristics include: 100 percent all electric building with an active mechanical heat recovery system 25 percent reduction of storm water runoff from the existing site High-reflectivity cool roof High-performance glazing Low-flow plumbing fixtures Advanced lighting controls, , Questions? Please email SRB@sfsu.edu |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
