Scriber Creek Trail Phase 3
Sector: Car parking • Location: Lynnwood, Washington, United States of America
Source: Lynnwood Washington
The project team is working towards 60% design completion and environmental permit approvals.
This project requires consultation with the U.S. Army Corps of Engineers, the Washington Department of Ecology, and the Washington Department of Fish and Wildlife. This is to confirm potential project impacts, minimization efforts, identify mitigation needs, and confirm environmental strategy.
The proje
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project team is working towards 60% design completion and environmental permit approvals. This project requires consultation with the U.S. Army Corps of Engineers, the Washington Department of Ecology, and the Washington Department of Fish and Wildlife. This is to confirm potential project impacts, minimization efforts, identify mitigation needs, and confirm environmental strategy. The project received a National Environmental Policy Act (NEPA) Categorical Exclusion in October 2021. PROJECT SUMMARY This project will make critical upgrades to a 4,000-linear‑foot section of shared‑use path from the Lynnwood Transit Center to Wilcox Park. It will also improve public access and enjoyment of public parklands. A nonmotorized transportation connection between Lynnwood’s Regional Growth Center & City Center Sub-Area, the Interurban Regional Trail, the Lynnwood Transit Center, and the future Lynnwood Link light rail station (2023) and SWIFT bus-rapid transit routes on 196th St SW (SR 524). These upgrades comprise Phase 2 and Phase 3 of a three‑phase improvement plan: Phase 1 - Connects the Interurban Trail to Scriber Creek Park along the south-southwest edge of the future light rail station. It is designed, permitted, and under construction as part of Sound Transit’s Lynnwood Link Extension project. Phase 2 - Extends from the southwestern corner of the transit center to approximately 100 feet north of 200th Street SW, just north of Sprague’s Pond Mini Park. Phase 3 - Extends from the terminus of Phase 2 just north of 200th Street SW to Wilcox Park. Users of the existing trail currently face many barriers. These include: Varies in width (4-8’) and has a variety of surfaces Current alignment includes sharp 90 degree turns. This makes it difficult for a cyclist to navigate safely while sharing with pedestrians. Damage from extended seasonal flooding, soil settlement, tree root heaving, and watershed fluctuation. To reduce and solve these problems this project will: Elevate the trail over wetland and streams to ease trail flooding Increase the width of the trail to 10-12 feet with 2-foot shoulders Re-align the trail to allow for wider turns Boardwalk decking, made of pervious fiberglass grating, will be used when crossing Scriber Creek and the associated wetland complex. This grating allows filtered sunlight and precipitation to reach the ground. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
