Scriber Creek Trail Phase 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The improvement of approxi-mately 21,700 lineal feet, of shared use trail between 200th St SW and Wilcox Park and approxi-mately 400 lineal feet of paved pathway between the shared use trail and 53rd Ave W by clearing and grubbing, trimming wetland vegetation, removing structures and obstructions, removing tim-ber bridges and wood abutments, roadway excavation, furnishing and installing steel pin
- Status
- Prospective
- Sector
- Rail, Consumer Products, Steel, Bridge, Car parking, Automotive, Road, Mass Transit, Commercial, Metal
- Location
- Lynnwood, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Scriber Creek Trail Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvement of approxi-mately 21,700 lineal feet, of shared use trail between 200th St SW and Wilcox Park and approxi-mately 400 lineal feet of paved pathway between the shared use trail and 53rd Ave W by clearing and grubbing, trimming wetland vegetation, removing structures and obstructions, removing tim-ber bridges and wood abutments, roadway excavation, furnishing and installing steel pin piles, fur-nishing and installing elevated boardwalk structures, placing aggregates and hot mix a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lynnwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Rail, Consumer Products, Steel, Bridge, Car parking, Automotive, Road, Mass Transit, Commercial, Metal |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 4BU/US 1BU/US 23BU @ CSX 637621H - GRADE SEPARATION
- CREPE MYRTLE STREET & RAILROAD AVENUE - MT. AIRY
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- CR 385/HORTENSE RD @ NS 637275V
- CR 316/ADAIRSVILLE @ CSX RR (340493C)
- SR 27/VIENNA @ SCL RR
- 124th avenue ne corridor
