logo
ProjectBidding

SCSD1 Main Campus Power Distribution Upgrades

Bidding · Wyoming · Last reported Dec 2024

Source: Dodge USA

Project is generally described as completing the campus changeover from Medium Voltage ownership. Electrical site work to facilitate new medium voltage lines by Rocky Mountain Power (RMP). The pathways will continue from junction cabinet installed under phase 1 and will route through the south side of campus and out to a new service point connection (by RMP). Multiple new junction points will be i

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Road, Power Transmission
Location
Pinedale, Wyoming, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SCSD1 Main Campus Power Distribution Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SCSD1 Main Campus Power Distribution Upgrades” is an infrastructure initiative in the Commercial sector, located in Pinedale, Wyoming, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project is generally described as completing the campus changeover from Medium Voltage ownership. Electrical site work to facilitate new medium voltage lines by Rocky Mountain Power (RMP). The pathways will continue from junction cabinet installed under phase 1 and will route through the south side of campus and out to a new service point connection (by RMP). Multiple new junction points will be installed. Service laterals will come to a new utility distribution transformer for each building,...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wyoming

City

Pinedale

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Road, Power Transmission

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project