SD 260 Newbury ST
Sector: Road • Location: Boston, Massachusetts, United States of America
Source: City of Boston
;Change occupancy to;mercantile/retail use at the ground and first floors with R-1 Transient Use Dwelling 17 Units on the floors above. The proposal includes new MEPFP systems, sprinkler and installation of groundwater mitigation system, an elevator, floors, walls, ceilings, doors, windows, bathrooms, kitchens and insulation. The proposed project also includes the construction of a new penthouse a
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SD 260 Newbury ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | ;Change occupancy to;mercantile/retail use at the ground and first floors with R-1 Transient Use Dwelling 17 Units on the floors above. The proposal includes new MEPFP systems, sprinkler and installation of groundwater mitigation system, an elevator, floors, walls, ceilings, doors, windows, bathrooms, kitchens and insulation. The proposed project also includes the construction of a new penthouse addition/roof deck and rear addition with roof deck. In addition, a new recessed entry terrace is proposed on Newbury Street. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
