logo

SDBOC ELIPS Phase IID

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

The YRBWEP Conservation Program is a joint program funded in part by Washington State Department, Sunnyside Division Board of Control/Sunnyside Valley Irrigation District (SDBOC/SVID). ECOLOGY’s funding for this program is derived from the Agricultural Water Supply Facilities Referendum 38, Chapter 43.99E RCW, November 1980, and represents 17½ percent of the funding for implementation of approved

Project Information FAQ

Project Information

4 Q
The project “SDBOC ELIPS Phase IID” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The YRBWEP Conservation Program is a joint program funded in part by Washington State Department, Sunnyside Division Board of Control/Sunnyside Valley Irrigation District (SDBOC/SVID). ECOLOGY’s funding for this program is derived from the Agricultural Water Supply Facilities Referendum 38, Chapter 43.99E RCW, November 1980, and represents 17½ percent of the funding for implementation of approved water conservation measure(s). RECLAMATION’s funding is authorized under Yavapai-Prescott Indian Tribe Water Settlement Act of 1994; P.L. 103-434, Section XII—Yakima River Basin Water Enhancement Project, and represents 65 percent of the funding to implement approved water conservation measures. The Recipient must fund the remaining 17½ percent of the cost to implement water conservation measure(s). Following the provisions of the Basin Conservation Program, SDBOC/SVID completed a Water Conservation Plan in 1998 that included long-term rehabilitation of conveyance facilities. The plan was adopted by the District in 1998. SVID has completed two Phases of canal and lateral lining (Phase I, Phase IIB and soon to complete Phase IIC) identified in the 1998 plan, replaced many of the original check structures, and has pursued an aggressive program of converting ditches to piped laterals. This Water Conservation Plan was reviewed and accepted for Feasibility Investigation by Reclamation and Ecology. SVID completed the Feasibility Investigation in March of 2007. The purpose of this grant agreement is to provide cost share funding for Phase IID ELIPS lateral lining as set forth in the Feasibility Investigation. This project will encourage the voluntary reduction in water diverted from the Yakima River to further the YRBWEP goals. Simply stated, these goals are to improve the availability of water supplies for irrigation and to protect and enhance fish and wildlife resources, including wetlands, while improving the quality of water in the Yakima River basin. 1. Will on its own account or by contract or contracts, shall construct the Project substantially in accordance with the plan approved for funding under Referendum 38 and Title XII of Pub. L. 103-434, and as set forth in the Scope of Work subject to such written modifications or changes in plan as may be agreed upon by the RECIPIENT, ECOLOGY, and RECLAMATION. 2. Will perform or cause to be performed all of said work pursuant to detailed plans, designs, estimates, and specifications, and in accordance with sound engineering practices, all as approved by ECOLOGY and RECLAMATION as adequate to protect the interests of the United States and the State of Washington in the Project. 3. Agrees to pay for any increase in operation and maintenance costs associated with the proposed work, either from reserve accounts, tax revenues and/or assessments. 4. Agrees to complete construction of the Project works within a maximum of 7 years; provided, however, that such construction period may be extended if Federal and State funds are not available for whatever reason. Written approval of ECOLOGY and RECLAMATION must be given to extend the work schedule. No substantial involvement on the part of Reclamation is anticipated for the successful completion of the objectives to be funded by this award. It is anticipated that Reclamation’s involvement will consist of standard federal stewardship responsibilities such as monitoring project performance, technical assistance at the request of the recipient, etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data