logo

SD/DOT: I-90 Interchange Reconstruction

Sector: Commercial • Location: Brandon, South Dakota, United States of America

Source: Dodge USA

Project
Closed

I90E I90W SD11 I90 - Exit 406 (Corson/Brandon Interchange) ; SD11 - Fm Redwood Blvd to AshSt in Brandon & 260th St Intersection in Corson Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing, ADA,Interchange Reconstruction (300k CuYd), Replace Str Bridge ((2) 222' Steel Girder Bridges, 185' Prestressed Girder Bridge), Lighting, PCC Surfacing (80k SqYd), Retaining Walls ; Grading

Status
Closed
Sector
Commercial, Water Supply and Storage, Bridge, Car parking, Steel, Waste Processing and Treatment, Road, Automotive, Metal
Location
Brandon, South Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SD/DOT: I-90 Interchange Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SD/DOT: I-90 Interchange Reconstruction” is an infrastructure initiative in the Commercial sector, located in Brandon, South Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I90E I90W SD11 I90 - Exit 406 (Corson/Brandon Interchange) ; SD11 - Fm Redwood Blvd to AshSt in Brandon & 260th St Intersection in Corson Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing, ADA,Interchange Reconstruction (300k CuYd), Replace Str Bridge ((2) 222' Steel Girder Bridges, 185' Prestressed Girder Bridge), Lighting, PCC Surfacing (80k SqYd), Retaining Walls ; Grading, Curb & Gutter, Storm Sewer, Sidewalk, ADA

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Brandon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Car parking, Steel, Waste Processing and Treatment, Road, Automotive, Metal

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project