SD/DOT: I-90 Interchange Reconstruction
Sector: Water Supply and Storage • Location: Brandon, South Dakota, United States of America
Source: Dodge
I90E I90W SD11 I90 - Exit 406 (Corson/Brandon Interchange) ; SD11 - Fm Redwood Blvd to AshSt in Brandon & 260th St Intersection in Corson Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing, ADA,Interchange Reconstruction (300k CuYd), Replace Str Bridge ((2) 222' Steel Girder Bridges, 185' Prestressed Girder Bridge), Lighting, PCC Surfacing (80k SqYd), Retaining Walls ; Grading
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Bridge, Waste Processing and Treatment, Car parking, Automotive, Steel, Commercial, Metal
- Location
- Brandon, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SD/DOT: I-90 Interchange Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I90E I90W SD11 I90 - Exit 406 (Corson/Brandon Interchange) ; SD11 - Fm Redwood Blvd to AshSt in Brandon & 260th St Intersection in Corson Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing, ADA,Interchange Reconstruction (300k CuYd), Replace Str Bridge ((2) 222' Steel Girder Bridges, 185' Prestressed Girder Bridge), Lighting, PCC Surfacing (80k SqYd), Retaining Walls ; Grading, Curb & Gutter, Storm Sewer, Sidewalk, ADA |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Brandon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Bridge, Waste Processing and Treatment, Car parking, Automotive, Steel, Commercial, Metal |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
