logo

SD/DOT: I90E Interchange Reconstruction

Sector: Commercial • Location: Piedmont, South Dakota, United States of America

Source: Dodge

Project
Design Development

I90 EBL & WBL - Fm E of Exit 44 to W of Exit 48; Exit 46 (Elk Creek Rd) Grading, Interchange Reconstruction (Exit 46), PCC Surfacing, Asphalt Concrete Surfacing (15k Ton)

Status
Prospective
Sector
Commercial, Road, Bridge, Cement
Location
Piedmont, South Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about SD/DOT: I90E Interchange Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SD/DOT: I90E Interchange Reconstruction” is an infrastructure initiative in the Commercial sector, located in Piedmont, South Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Design Development

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I90 EBL & WBL - Fm E of Exit 44 to W of Exit 48; Exit 46 (Elk Creek Rd) Grading, Interchange Reconstruction (Exit 46), PCC Surfacing, Asphalt Concrete Surfacing (15k Ton)

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Piedmont

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Road, Bridge, Cement

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project