logo

SDN-KEPCO Veliko Tarnovo Solar Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

A 50-50 joint venture of SDN Company and Korean South-East Power (KOSEP) had reached financial closure on the 42 MW Veliko Tarnovo Solar PV project. The project consisted of two 21 MW solar plants in Zlataritsa and Samovodene, Central Bulgaria. KOSEP is a subsidiary of the power generation company KEPCO.

Construction of the project started in December 2010 and was planned to be completed in Sept

Status
Prospective
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Solar, Commercial
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SDN-KEPCO Veliko Tarnovo Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SDN-KEPCO Veliko Tarnovo Solar Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 50-50 joint venture of SDN Company and Korean South-East Power (KOSEP) had reached financial closure on the 42 MW Veliko Tarnovo Solar PV project. The project consisted of two 21 MW solar plants in Zlataritsa and Samovodene, Central Bulgaria. KOSEP is a subsidiary of the power generation company KEPCO. Construction of the project started in December 2010 and was planned to be completed in September 2011. Negotiations over the contract were done via a delegation of South Korea and the Bulgarian Prime Minister Boiko Borisov. The investment is part of a larger investment plan totaling EUR 500 million ($671 million) in Bulgarian projects by SDN. As part of the deal, SDN announced a BGN 1 million ($686,000) corporate social responsibility grant towards the Bulgarian Ministry of Economy, to be spent freely. The project received a renewable energy license from the State Energy and Water Regulatory Commission (SEWRC), as well as a contract for selling electricity to the National Electricity Company (NEK). The developer also invested $5 million in the local substation, to be tranfered to the government upon commissioning. Total investment in the project was reported as EUR110 million ($146 million) in debt, and EUR43 million ($57 million) in equity. The debt/equity ratio was thus 72/28. The debt was structured as a EUR101 million ($134 million) 12 year loan and a EUR9 million ($12 million) 18 months revolver loan arranged by KDB. Syndication took place on 9 March 2011. Financing was provided by the Korea Development Bank (KDB), Korea Finance Corporation (KoFC), Hyundai Marine & Fire Insurance, Green Cross Life Insurance, KT Capital and Tong Yang Life Insurance. The PPP fields below reflect distribution of total debt ($146 million) equally between institutions, six equal portions of $24.3 million. The project was commissioned in March 2012.

Original sector

Energy

Procurement method

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Solar, Commercial

Article published date

2024-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project