SDSU Huāxyacac Hall
Sector: Commercial • Location: San diego, California, United States of America
Source: Clark Construction
San Diego State University's (SDSU) Huāxyacac Hall is a 200,000-square-foot residence building with space to accommodate up to 600 students. Huāxyacac Hall is tied-in with the adjacent dorm (Chapultepec) through shared student amenities, including a market, coffee shop, courtyards, dining terrace, roof garden, communal kitchen, laundry, recreation space, amphitheater, and food truck court, which k
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | San Diego State University's (SDSU) Huāxyacac Hall is a 200,000-square-foot residence building with space to accommodate up to 600 students. Huāxyacac Hall is tied-in with the adjacent dorm (Chapultepec) through shared student amenities, including a market, coffee shop, courtyards, dining terrace, roof garden, communal kitchen, laundry, recreation space, amphitheater, and food truck court, which knit the old and new buildings together. Joining the Old and New through Campus Features The project features Mission Revival Style architecture, reminiscent of the historic central campus, and is designed to give SDSU the flexibility to provide double, triple, or quadruple rooms depending on enrollment. The Hall includes apartments for staff, multi-purpose rooms, faculty offices, study lounges, a community kitchen, a community center, a mail room, indoor bike storage, laundry facilities, outdoor courtyard space, and a roof deck. While wood is a critical design element of the campus’ Mission Revival Style architecture, project specifications called for non-combustible materials only. To maintain authenticity while still meeting requirements, the team used high-impact foam to create faux wood beams and cornices throughout the structure. The team also deployed a drone on the project to safely and accurately survey utilities at the project site. Opportunities and Challenges in Construction During project development, the team provided a comprehensive design review with value analysis, site utilization, LEED coordination, Building Information Modeling (or BIM), and constructibility review. Some of the proposed solutions and value analysis options presented, such as the relocation and redesign of the student market and the use of trickle vents instead of standard ductwork and ventilation in the dorms, yielded over $16 million in savings for SDSU. One particularly challenging aspect of the project came at the start when the team was faced with building a complex retaining wall in the canyon north of the site. The team installed soldier piles along the canyon edge and built the retaining wall from the ground up. Crews utilized a modified rig to drill the tiebacks over the top of the retaining wall since they could not get equipment into the canyon. Once the retaining wall was backfilled, workers lowered prefabricated rebar cages into the canyon to be placed on the outside face of the lagging walls. A scaffold was erected to shotcrete the lagging wall between the canyon edge (about 10 feet of space). Awards 2020 AGC San Diego Build San Diego Award (Public Work) |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
