SE 37th Street Construction
Sector: Water Supply and Storage • Location: Topeka, Kansas, United States of America
Source: Dodge
Mobilization 1 LS Contractor Construction Staking 1 LS Removal of Existing Structures 1 LS Clearing & Grubbing 1 L.S. Pavement Removal 63 S.Y. Unclassified Excavation 46 C.Y. Supplementary Borrow 381 C.Y. Embankment 320 C.Y. Concrete Grade 4.0(AE) 48.9 C.Y. Reinforcing Steel Grade 60(Epoxy Coated) 8,440 Lbs. Foundation Stabilization (Set Price) 17 C.Y. Temporary Shoring 1 L.S. Temporary Surfacing
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Steel, Road, Commercial, Waste Processing and Treatment, Metal
- Location
- Topeka, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SE 37th Street Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mobilization 1 LS Contractor Construction Staking 1 LS Removal of Existing Structures 1 LS Clearing & Grubbing 1 L.S. Pavement Removal 63 S.Y. Unclassified Excavation 46 C.Y. Supplementary Borrow 381 C.Y. Embankment 320 C.Y. Concrete Grade 4.0(AE) 48.9 C.Y. Reinforcing Steel Grade 60(Epoxy Coated) 8,440 Lbs. Foundation Stabilization (Set Price) 17 C.Y. Temporary Shoring 1 L.S. Temporary Surfacing (AB-3) 71 Tons Class II Stone Riprap 197 S.Y. 8" Culvert (PVC) 54 L.F. 8 Asphaltic Concrete 104 T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Topeka |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Steel, Road, Commercial, Waste Processing and Treatment, Metal |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
