SE Avalon Drive New Sidewalk
Sector: Water Supply and Storage • Location: Stuart, Florida, United States of America
Source: Dodge
Construction of 2,584 linear feet of a 6-foot-wide sidewalk along the west side of SE Avalon Drive, between SE Cove Road and SE Salerno Road in Stuart, FL. The work includes modifications to existing roadside swales and drainage outfall structures, including the installation of dual reinforced concrete pipes (RCP) and concrete end wall. Additionally, the project includes pavement markings and sign
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial
- Location
- Stuart, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SE Avalon Drive New Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of 2,584 linear feet of a 6-foot-wide sidewalk along the west side of SE Avalon Drive, between SE Cove Road and SE Salerno Road in Stuart, FL. The work includes modifications to existing roadside swales and drainage outfall structures, including the installation of dual reinforced concrete pipes (RCP) and concrete end wall. Additionally, the project includes pavement markings and signage. The County of Martin may be seeking a consultant to prepare a SE Avalon Drive New Sidewalk D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Stuart |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
