SE Berryton Road Culvert Replacement & Improvements
Sector: Water Supply and Storage • Location: Berryton, Kansas, United States of America
Source: Dodge
Replacement of Culvert on SE Berryton Road Over Tributary to Lynn Creek. DESCRIPTION OF MAJOR UNITS OF WORK: Mobilization 1 LS Removal of Existing Structures 1 LS Clearing & Grubbing 1 LS Pavement Removal 2,744 S.Y. Unclassified Excavation 5,536 C.Y. Supplementary Borrow Material 834 C.Y. Embankment 4,409 C.Y. Combined Curb & Gutter, Type I 1,214 L.F. 4 Concrete Sidewalk, 5 -0 Wide 1,599 S.F. 5 Co
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Berryton, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SE Berryton Road Culvert Replacement & Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of Culvert on SE Berryton Road Over Tributary to Lynn Creek. DESCRIPTION OF MAJOR UNITS OF WORK: Mobilization 1 LS Removal of Existing Structures 1 LS Clearing & Grubbing 1 LS Pavement Removal 2,744 S.Y. Unclassified Excavation 5,536 C.Y. Supplementary Borrow Material 834 C.Y. Embankment 4,409 C.Y. Combined Curb & Gutter, Type I 1,214 L.F. 4 Concrete Sidewalk, 5 -0 Wide 1,599 S.F. 5 Concrete Sidewalk, 10 -0 Wide 5,369 S.F. 6 Concrete Driveway 1,086 S.F. Curb Inlet, Type I, L=8 ft.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Berryton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
