SE Extremoz II
Sector: Steel • Location: Brazil
Source: World Bank Group
In December 2011, the Brazilian company Neoenergia S.A., was awarded in a competitive bidding process the contract to build and operate a substation located at the state of Rio Grande do Norte (SE Extremoz II, 230/69 kV-300 MVA).
Two other companies took part in the contest: ALUPAR INVESTIMENTO S/A; and state-owned company CHESF. The bidding criteria set by the regulatory agency ANEEL was the lo
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SE Extremoz II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2011, the Brazilian company Neoenergia S.A., was awarded in a competitive bidding process the contract to build and operate a substation located at the state of Rio Grande do Norte (SE Extremoz II, 230/69 kV-300 MVA). Two other companies took part in the contest: ALUPAR INVESTIMENTO S/A; and state-owned company CHESF. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Neoenergia presented the lowest offer, a total value of US$ 0.8 million (BRL 2.28 million), 43.53% below the ceiling set by the regulatory agency. The contract was signed in May 2012, and the sponsor presented the company Narandiba S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 8.3 million (BRL 24.66 million) in the SE Extremoz II. Environmental clearance was awarded in late 2012. Construction works were concluded in April 2015, and commercial operation commenced in July 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project